This project replaced the driving surface (bridge deck) on Route 76 bridge over Table Rock Lake in Cape Fair. Replaced bridge railings and installed new guardrail at bridge ends.
Missouri Route 76/Table Rock Lake Bridge OPEN to Traffic In Cape Fair on Tuesday, May 18
Project Displays/Maps
Project Updates/Traffic Alerts
-
MoDOT TRAFFIC ALERT: Missouri Route 76/Table Rock Lake Bridge is OPEN to Traffic
Where: Missouri Route 76 bridge over Table Rock Lake is OPEN to traffic in Cape Fair
When: Today, Tuesday, May 18
Details: Contractor crews closed the bridge on May 10 to re-install a new overlay
Project Details:
- Project replaced Missouri Route...
-
MoDOT TRAFFIC ALERT: Missouri Route 76/Table Rock Lake Bridge CLOSED May 10-20
Where: Missouri Route 76 bridge over Table Rock Lake Scheduled to CLOSE in Cape Fair
When: Monday, May 10 until Thursday, May 20
Details: During construction there were issues with the bonding of the new overlay. On February 26, the contractor...
Project Facts:
- Replace driving surface (bridge deck) on Route 76 bridge over Table Rock Lake in Cape Fair
- Replace bridge railings
- Install new guardrail at bridge ends
Construction: September 2020-May 2021
Estimated total project cost: $2.4 million
Bridge Facts:
- Built in 1957
- Carries 4,048 vehicles a day
- Current bridge deck in need of frequent repairs
- Route 76/Table Rock bridge rehab project will be combined with the Route 248/Railey Creek bridge replacement. (Work on bridges will NOT take place at the same time.)
Traffic Impacts:
- One-lane traffic with temporary traffic signals during daytime hours
- Bridge CLOSED at night. Work hours: 6 p.m. to 6 a.m.