To address safety concerns related to at-grade railroad crossings, in particular the one just north of U.S. Route 60 and Greene Count Route MM. Three existing railroad crossings will be closed to reduce impacts to motorists. This project will also address current & projected congestion as this corridor becomes increasingly developed.
Project highlights:
- Build new Route MM between Farm Road 160 and Route 60
- Widening of Route MM to 4 lanes between Farm Road 160 and Haile Street
- Roundabout on Route MM (Brookline Avenue) at Farm Road 160
- 8" raised concrete median from Route 60 to Haile Street with breaks at new Stone Falls Road/Commercial St. intersection
- Build bridge over BNSF Railroad south of Haile Street
- Remove U.S. Route 60 intersection at Commercial Avenue/Farm Road 103
- Farm Road 164 closed west of Route 60
- Expand existing intersection at Route 60 & Stone Creek Drive and connect to new Route MM
- Close BNSF Railroad crossings at Route 60 and Farm Road 170, Route MM and Farm Road 168, and East Haile Street/Orr Street in Brookline
- Pedestrian trail along eastern side of new Route MM from Route 60 to pedestrian underpass east of future bridge
- Sidewalk and pedestrian access improvements from Route 60 to Haile Street
- Estimated Construction Cost: $35.7 million
Traffic Impacts:
- Route MM at Farm Road 160 to remain OPEN during most of the project
- Intersection may be CLOSED intermittently, but not for long periods of time.
- Lane closures on Route 60 near existing Commercial Avenue/Farm Road 103 intersection
- Existing intersection at Route 60 and Commercial Avenue/Farm Road 103 permanently closed following project completion
- Farm Road 164 west of Route 60 permanently closed following project completion
- Railroad crossings closed at Route 60 and Farm Road 170, Route MM and Farm Road 168, and East Haile Street/Orr Street in Brookline
Future Route MM Proposed Projects Not Yet Funded:
Route MM Widening North of Route 360:
- Widening Route MM to 4 lanes between I-44 and north of Route 360/James River Freeway
- Estimated Construction Cost: $16.2 million (currently unfunded)
Route MM Widening South of Route 360:
- Widening of Route MM to 4 lanes from Route 360/James River Freeway to Haile Street
- Intersection improvements
- Estimated Construction Cost: $9.9 million (currently unfunded)
Route ZZ Extension:
- Build new Route ZZ extending it between Route 60/new Route MM and Route ZZ (Wilson’s Creek Boulevard)/Route M (Republic Road) intersections
- Build bridge over BNSF Railroad at Farm Road 103
- Possible roundabout on new Route ZZ extension and Route ZZ (Wilson’s Creek Boulevard)/Route M (Republic Road) intersection
- Estimated Construction Cost: $31.2 million (currently unfunded)
PROJECT UPDATES
-
MoDOT: Greene County Route MM Realignment Project In Republic Focus of Public Hearing
Republic, Greene County – Those interested in the Greene County Route MM Realignment Project in Republic are invited to a public hearing to discuss proposed improvements and project information on Tuesday, April 2, the Missouri Department of...
-
MoDOT: I-44 Corridor Improvements Project in Springfield Focus of Public Meeting Tuesday, March 19
Springfield – Those interested in a project to improve traffic flow along the I-44 corridor in Springfield are invited to a public meeting to discuss proposed improvements and project information on Tuesday, March 19, the Missouri Department of...
-
MoDOT: Plans to Replace the Greene County Route V Bridge Over Clear Creek North of Ash Grove
Greene County – The public is invited to a virtual (online) public meeting starting Monday, October 2, to learn more about plans for replacing the Greene County Route V bridge over Clear Creek north of Ash Grove, the Missouri Department of...
-
MoDOT: Intersection Improvements Project at U.S. Route 160 North of Nixa
Nixa, Christian & Greene County – Those interested to learn more about the U.S. Route 160 Intersection Improvements Project at Christian County Routes AA and CC north of Nixa are invited to a public meeting on Tuesday, June 27, the Missouri...
Project Displays/Maps
- Greene Co Route MM Realignment Fact Sheet
- Route MM Realignment Project Map
- Proposed U.S. 60 & Farm Road 103 Intersection
- Proposed Two-Lane Roundabout at Farm Road 160 and Route MM
- Route MM Realignment Permanent Road Closures
- Project Vicinity Map of Current & Future Route MM Projects
- Pathways of Progress: A Property Owners Guide on Land Acquisition for Transportation Improvements
Frequently Asked Questions:
When will the road closures take place?
The BNSF Railroad crossings at Route 60 and Farm Road 170, Route MM and Farm Road 168 and East Haile Street/Orr Street in Brookline and the Route 60 intersection road closures at Farm Road 103, Commercial Avenue and Farm Road 164 will be closed toward the end of the project after the rest of the improvements are open to traffic.
How was this alignment chosen?
An alternatives analysis was performed to compare multiple alignments and intersection designs. The current layout was determined with considerations to environmental constraints and an effort to minimize impacts to adjacent property owners.
Why a roundabout at Farm Road 160?
A traffic study was used to compare intersection capacity between a signalized intersection and a roundabout at this location. A dual-lane roundabout with a free westbound to northbound right-turn was determined to result in the shortest delays and a reduced crash frequency.
What type of pedestrian improvements will be constructed with this project?
A 10-foot-wide multi-use trail will be built along the east side of the new alignment in coordination with the city of Republic between Route 60 and the railroad overpass, while a new sidewalk will continue over the railroad and north to Haile St. A pedestrian underpass will allow a safe connection for pedestrians between the east and west sides of the alignment.
Is MoDOT purchasing property from landowners?
MoDOT will need to purchase property and/or obtain easements in order to construct the realignment of Route MM, build the new sidewalk, and widen existing facilities. A Right of Way representative will be contacting affected landowners to begin the acquisition process. For more information on the acquisition process, please see the Pathways of Progress display above.